Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.9294460

- Product Categories
- Friendly Links
- home > Supply > Pressure tank head factory price list, pressure tank head factory supply, pressure tank head plant material
Pressure tank head factory price list, pressure tank head factory supply, pressure tank head plant material
Information Name: | Pressure tank head factory price list, pressure tank head factory supply, pressure tank head plant material |
Published: | 2013-05-10 |
Validity: | 365 |
Specifications: | Whole |
Quantity: | 0.00 |
Price Description: | |
Detailed Product Description: | Pressure tank head plant price list, pressure tank head factory supply, pressure tank head plant material http://www.0312666.com/ Phone 0317-8210122 Mobile 13722724665 GB150-1998 cylinder with oval The head butt weld ring is defined as Class A welded joints. A wall thickness calculation of the cylinder and head connection form, we first look at the calculation of the wall thickness of the container. 1.1 cylinder wall thickness calculation we know that the stress condition of the cylinder is a two-phase film stress, hoop stress is twice the axial stress, the internal pressure of the cylinder wall thickness is calculated from the cylinder internal pressure static balance conditions are derived. Figure 1 shows the internal pressure cylinder by trying. |
Admin>>>
You are the 14246 visitor
Copyright © GuangDong ICP No. 10089450, Head cap factory in Hebei prosperity All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 14246 visitor
Copyright © GuangDong ICP No. 10089450, Head cap factory in Hebei prosperity All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility